Main Index |
TIPS Home |
voluntary_amtvoluntary_amt (variable)
Voluntary amount to be sunk (as a fraction)
Declared as: double
Description:
contains the voluntary amount (as a fraction of the mandatory amount sunk) to be sunk at each date of a sinking fund schedule. voluntary_flag should be set to 0 when using this variable. If the amounts are different at each date, use the alternate variable voluntary_amts.
Valid values:
Any number zero or greater
Data Validation Routine: ok_sf_amt
| © 2001 TIPS, Inc. | Doc Version: 5.0 |