Go To Documentation Main IndexMain Index
Go To TIPS, Inc.TIPS Home
voluntary_amt

voluntary_amt (variable)

Voluntary amount to be sunk (as a fraction)

Declared as: double

Description: contains the voluntary amount (as a fraction of the mandatory amount sunk) to be sunk at each date of a sinking fund schedule. voluntary_flag should be set to 0 when using this variable. If the amounts are different at each date, use the alternate variable voluntary_amts.

Valid values:
  Any number zero or greater

Data Validation Routine: ok_sf_amt

© 2001 TIPS, Inc.Doc Version: 5.0