Go To Documentation Main IndexMain Index
Go To TIPS, Inc.TIPS Home
days_bsnl

days_bsnl (routine)

Calculate the number of days since base date 0 to the given date using the Actual/Actual Calendar but ignoring leap days

Introduced in release: 1.0
Component: Generic
Purpose: Calculates the actual, not including leap days, number of days between a given date in the format month, day, year and the base date 00/00/0000. This calculation is done to enable comparison of 2 dates.

Error Conditions: No inputs are checked in this routine. It is the responsibility of the calling routine to validate the given date. This can be accomplished by calling the routine ok_MDY.

Last Mod Date: 03/08/1991© 2001 TIPS, Inc.Doc Version: 5.0